Greentech - en ny kanin fra hatten.


22049 collersteen 16/11 2009 17:14
Oversigt

Greentech enery systems er netop kommet med denne meddelelse, som må betegnes som endnu en kanin fra hatten. Netop som man tror at de er løbet tør, så trækker de een op ad hatten. Det er synd at sige meddelelsen er særlig omfattende, og den rejser vel flere spgm. end den besvarer.
Hvilken underleverandør er der eks. tale om?
Møllerne er jo rejst, så det vigtigste der er tilbage må stadig være Nordex's arbejde i en eller anden form.
Kursen falder ikke særligt meget.... lidt underligt.

11/16/2009 15:28:01 - OMX Copenhagen, News
Greentech Energy Systems A/S Selskabsmeddelelse Minerva Messina-projektet
Herlev, 16. november 2009


Selskabsmeddelelse nr. 25/2009


Minerva Messina-projektet

I henhold til de italienske medier er der indledt politimæssige undersøgelser
mod ejeren og lederen af en betydende underleverandør til Minerva
Messina-projektet. Det skal understreges, at de politimæssige undersøgelser
omfatter forhold, der ikke er relateret til Minerva Messina-projektet.

Denne situation skaber for øjeblikket usikkerhed om underleverandørens mulighed
for at overholde den gældende tidsplan. En foreløbig vurdering tyder på, at der
- som følge af ovennævnte - vil ske en forsinkelse på 3-4 måneder med hensyn
til færdiggørelsen af projektet.



Med venlig hilsen

Bestyrelsen


For yderligere information:
Adm. direktør Kaj Larsen, tlf. 33 36 42 02
Bestyrelsesformand Svend Sigaard, tlf. 23 68 24 02




16/11 2009 17:26 Bøgen 022051



Og det næste der slår mig, har samme underlevereandør noget med MG projektet at gøre, for så er jeg ikke helt tryg..



16/11 2009 18:07 stengård 022057



lige en hurtig kommentar - resten må komme senere... Man må formode at det nu er slut med ekstrareghninger fra underleverandøren ...

Det er selvfølgelig på alle måder noget møg at sagen bliver udsat i 3-4 måneder - men det ændrer jo ikke ved at møllerne står der - og med forsinkelsen kan man måske forvente at man kan færdiggøre den rigtige nettilslutning bliver lavet istedet for "sløjfen".

Derudover lever meddelelsen jo fint op til den nye informationspolitik fra Siggaaard & co. - så tæt på intetsigende som muligt.

Så må jeg jo bare have fat i det uformelel italienske netværk...



16/11 2009 19:29 doodha 022064



Jamen, det vil da være fantastisk, hvis meddelelsen i virkeligheden dækker over en positiv begivenhed...

Jeg undrede mig godt nok over denne meddelelse, som efterlader flere spørgsmål end den besvarer.

At der også kan ligge noget positivt bag meddelelsen, kan måske også forklare det forholdsvis beskedne kursfald - og at det vist mest er udsalg fra småinvestorer.



16/11 2009 18:07 polopolo 022058



Det ville være utroligt rart at få lidt mere at vide . Hvordan kan en politiundesøgelse udsætte færdiggørelsen/tilslutningen af møllerne.Vi må have noget mere konkret fra ledelsen - de er jo i stand til at se en udsættelse på mange måneder. Har underleverandøren ikke betalt de maskiner han skal bruge til at opfylde sin ordre ? har han snydt i skat ? eller forurener han for meget ? Det er urimeligt at vi bliver spist af med så mangelfuld en udmelding!



16/11 2009 18:16 stengård 022059



det er en fornæmrende uinformatiov meddelelse... og så er det sagt :)



16/11 2009 20:07 stengård 1222066



Jeg har lige tjekket hos en kontakt hos Nordex - der kunne fortælle at der stadigt arbejdes normalt på sitet med møllerne, og at der også foregik arbejde fra de lokale entreprenører, og at tilbageholdelsen vist nok skete tirsdag/onsdag i sidste uge ... Ifølge Nordex-kontakten vil tidsplanen næppe blive skubbet ret meget som følge af det her for så vidt angår færdiggørelsen af møllerne - men som han siger let lakonisk "det er jo Sicilien..." Iøvrigt fortalte han den lille detalje - at det var ejeren af selskabet der var "midlertidigt indisponibel" - men at direktøren for selskabet skam var på arbejde som han plejede

Så umiddelbart er det stadigt substationen der skal færdiggøres af den lokale arbejdskraft - og så kan man (med lidt held) sætte møllerne på når "sløjfen" var lavet - Ihvertfald regnede man med at det kunne være afsluttet i god tid inden jul.

Så noget tyder på at man har sagt "rather safe tan sorrry" hos GES og sendt en meddelelse ud med et worst case scenario

Artiklen nedenfor redegør for forløbet .Langt alvorligere end det for Greentech er implikationen for IVPC - der har en del parker i sving på Sicilien. Parkerne er - som IVPC ejer - er nemlig blvet konfiskeret som sikkerhed for tilbagebetaling af de midler som IVPC uretmætssigt har fået som government grantst. Det kan sikkert godt få brynene til at rynkes hos Royal bank of Scotland der har finansieret parkerne...



Top executives arrested in Italy wind farm probe
By Guy Dinmore in Rome
Published: November 12 2009 02:00 | Last updated: November 12 2009 02:00

Italian finance police, mounting an operation codenamed "Gone with the wind", yesterday said they had arrested two of the country's most prominent businessmen in the wind energy sector on charges of fraud and are investigating their sales of wind farms to foreign companies.

Oreste Vigorito, head of the IVPC energy company and president of Italy's National Association of Wind Energy, was arrested on Tuesday in Naples. Vito Nicastri, a Sicilian business associate, was arrested in Alcamo, Sicily.

Two other men were arrested in Sicily and the Naples area, while 11 others were charged but not arrested. Police said the charges related to fraud involved in obtaining public subsidies to construct wind farms.

IVPC, a leading constructor and operator of wind farms in Italy, did not return calls asking for comment. Mr Vigorito is also well known as president of the Benevento football club.

"Gone with the wind", mounted by the finance ministry's anti-fraud police, started in 2007 and began by blocking public subsidies worth ?9.4m ($14m, £8.4m) granted by the ministry for economic development. Last year, police confiscated seven wind farms with 185 turbines in Sicily linked to IVPC.

Anti-mafia prosecutors in Sicily have launched a parallel investigation. The Financial Times was told in April that a large number of wind farms had been built with public subsidies but had never functioned. Some are visible on the hills above Corleone, a known mafia stronghold.

Police said yesterday they had sent requests for documentation to five foreign companies - two in the Netherlands and three in Spain - that were linked to IVPC. Other companies in Ireland and the UK, said to be Italian affiliates of IVPC, have been asked by Italian authorities to provide information.

Police also said they were carrying out checks on 12 companies in Italy, including a group of nine called variations of IP Maestrale, which share the same street name and number as IVPC in Avellino, near Naples.

International Power of the UK, the largest operator of wind farms in Italy last year with a market share of about 15 per cent, said it owned the IP Maestrale companies.

International Power acquired in 2007 its Maestrale portfolio of wind farms for ?1.8bn from Trinergy, an Irish company that had bought them from IVPC two years earlier.

Some of the projects had been developed by Mr Nicastri, although IP told the FT in April it had no direct relationship with him.

International Power has not been charged with any wrongdoing. International Power in London said yesterday: "We are aware of the arrests made in Italy yesterday. Criminal proceedings in Italy are conducted on a confidential basis and we will not make any comment on either the arrests or the individuals involved at this time."

Mr Nicastri told the FT in Alcamo in April he had developed the "majority" of Sicily's wind farms, arranging land, financing and official permits.

He had then sold some of the projects for construction to IVPC for further sale to foreign companies. All were functioning, he said at the time. His office declined to comment yesterday.









16/11 2009 20:52 Windstyrke 022068



Det er da noget forfærdelig lort hvis der er svindlet ved salg af vindmølleparker og eller anvendt/beviliget offentlige eller betroede midler. Kan det være sådan noget der ligger(gemt) i ankesagen MG.



16/11 2009 20:57 doodha 022070



Omvendt er det jo særdeles positivt, hvis der er sat en stopper for snyd og svindel - det er under alle omstændigheder poritivt, at det forfølges af myndighederne.



16/11 2009 21:05 Windstyrke 022071



Konfiskation af tyvekoster/betroede midler etc. kommer som regel til at gå ud over ikke bare sælgeren, men også køberen.



17/11 2009 09:55 stengård 022085



Jeg er interesseret i en forståelse af hvordan du kæder de to ting sammen ? Har du læst selskabets meddelelser om sagen og dens baggrund

http://www.greentech.dk/Images/Download%20PDFér/Fondsbørsmeddelelser/2008/0820-Appeals%20case%20concerning%20the%20Monte%20Grighine%20project%20-050808-eng%20.pdf






17/11 2009 12:58 Windstyrke 022100



En korrupt eller mafiastyret ledelse meddeler det der tjener den bedst. Jeg håber sandelig ikke det er tilfældet, men det ledelsen indtil videre har fortalt om økonomien, lånerelationer og projektudvikling(det gælder både den nye del af ledelsen som den gamle(Kaj og Framholdt) har jeg endnu ikke set meget til.
Sammenkædningen eller relationerne er ligger måske dig fjernt. Jeg holder fast i at den ledelse har jeg ingen tillid til. Den må nødvendigvis komme med nogle meldinger og resultater der holder.



17/11 2009 13:05 stengård 022102



Jeg synes straks du skal anmelde dem til politiet - "mafiastyret eller korrupt....." :)




17/11 2009 09:58 stengård 222086



Bøgen - det har han ikke - han er en lokal siciliansk leverandør (der bl.a. står for en del af "civil works") - p.t. laver hans selskab infrastrukturen (veje, afskærmninger, hegn med mere) - og han står bl.a. for de fysiske anlæg omkring sub-stationen som er ved at være færdig



17/11 2009 13:16 Bøgen 022104



Super;) Så håber jeg på bedre kurs når finansieringen er i orden..



17/11 2009 11:36 collersteen 122093



Fra RBB:

Greentech/CFO: Forsinkelse koster i småtingsafdelingen
Forsinkelsen af Minerva Messina-projektet i Italien kommer kun til at koste
Greentech Energy Systems i småtingsafdelingen. Det vurderer økonomidirektør i
Greentech Mark Fromholdt over for RB-Børsen.
Greentech regner med at projektet forsinkes i tre til fire måneder, fordi en
af selskabets underleverandørers direktør er under anklage fra det italienske
politi. Vindmølleparken vil dog kunne producere lige så lang tid i den anden
ende, forklarer Mark Fromholdt.
- Det er ikke sikkert det komme til at koste noget. Det kommer selvfølgelig
til at forsinke indtægtsgivende produktion, men man regner med at et sådant
projekt kører i 20 år, og her vil det jo kunne køre ekstra tre måneder i den
anden ende, fordi det går senere i gang, siger Mark Fromholdt til RB-Børsen.
Han vurderer, at de omkostninger selskabet har ved at skulle vente på
underleverandører er i småtingsafdelingen.
- Der vil selvfølgelig gå lidt længere tid før vi får afdraget på lån, og vi
kunne måske have sparet et par renter eller noget, men det er i
småtingsafdelingen.
Direktøren. der er sigtet for misbrug af offentlige midler i et gammelt
vindmølleprojekt , er underentreprenør på projektet og står for det simple
arbejde såsom kabellægning, forklarer Mark Fromholdt.
Han kalder de tre til fire måneders forsinkelse for et konservativt skøn.



18/11 2009 23:07 Kenddinvare 122225



Der er da forskel på at få 20 mio. kr. i det næste kvartal og i forhold til om 20 år. Ved en diskonteringsrente på 10% har sidstnævnte kun en nutidsværdi på ca. 2,5 mio. kr..
Hvis der er tale om et isoleret tab burde kursen på GES altså være faldet ca. 1%, så der blev indregnet en mistillidsfaktor.



18/11 2009 23:10 stengård 022227



det var nu også en hård diskonteringsrente.... de kommer nok til at betale cirka halvdelen :)



23/11 2009 17:38 Kenddinvare 322529



Ja en diskonteringsrente på 10% er høj i forhold til de lånerenter, der skal betales, men hvad hvis man ser på den ønskede/forventede forrentning af virksomhedens kapital over 20 år?

Tidligere har man så vidt jeg husker talt om en intern forrentning på projekter på (over?) 15% og vi har et vindmøllemarked, som forventes at vokse med op til 20% om året.

På det helt korte sigt mangler de 20 mio. kr. i kassen om et kvartal og det i en situation, hvor der er spist godt af indtægten fra salget af halvdelen af MonteGrihine til færdiggørelse af MG og MM, således at spekulationer/usikkerhed har presset aktiekursen ned.
Sidstnævnte lå jo også i min slutkommentar om at selv et tab på 20 mio. kr. ikke burde påvirke kursen mere end 1% ned.



23/11 2009 19:32 doodha 022533



På sådan en trist dag, kan vi glæde os over, at der er kommet et par nye billeder på hjemmesiden:

http://www.greentech.dk/Default.aspx?ID=574



24/11 2009 06:01 polopolo 022546



Nu har vi så haft en uges tid til at tænke over den sidste negative og upræcise udmelding fra firmaet.
Hvad pokker ligger der bag.
Ingen af os forstår hvorfor en politisag,, der ikke berører GES direkte men kun underleverandøren, kan udsætte opstart så længe. Den pudseløjerlige forklaring om at så kører projektet længere lyder som noget man siger til sin bank/kautionist/kritiske aktionærer -når man tror at den sande forklaring ikke kan tåles.
Jeg har noteret mig at Stengård anser betingelser for den nye finansiering for at være formaliteter og det glædede og beroligede mig. Men jeg mister mere og mere tillid til firmaet.



24/11 2009 10:45 Bombur 222552



Jeg er meget enig. Forklaringen med, at møllerne vil køre længere i den anden ende, er en hån mod aktionærernes intelligens, da det er nu likviditeten er kritisk.

Jeg håber Greentech har lært, at de fremover aldrig mere selv vil stå for opførelse af vindmølleparker og kun købe Turn Key projekter. De kan ganske enkelt ikke styre projekterne.